*40. Will the Minister-in-charge, Health & Family be pleased to state:-

   
 

(a) Whether the Government has made any sanction for Public Health Centre under the Basic Minimum Scheme?

  (a) Yes, Sir.
 
 
(b) If so, number of P.H.Cs by name?   (b) The name of the P.H.Cs is as follows:-
    (i) Jaintia Hills District.
        (1) Iooksi
        (2) Bataw.
        (3) Khliehtyrsi.
    (ii) East Khasi Hills.
        (1) Diengpasoh.
        (2) Wahsherkhmut.
        (3) Ryngku.
        (4) Smit.
    (iii) Ri-Bhoi
        (1) Warmawsaw.
        (2) Umtrai.
    (iv) West Khasi Hills.
        (1) Rangthong.
        (2) Wahkaji.
        (3) Nongum.
        (4) Wahrit.
        (5) Nonglang (Mawthengkut)
        (6) Dongki-Ingding.
        (7) Maweit.
    (v) East Garo Hills.
        (1) Wageasi.
        (2) Adokgiri.
    (vi) South Garo Hils.
        (1) Maheshkhola.
        (2) Rongohongiri
    (vii) West Garo Hills.
        (1) Babadam.
        (2) Salmanpara.
        (3) Pedaldoba.
        (4) Belbari.
        (5) Rangsakona.
(c) If not, the reasons thereof?   (c) Does not arise in view of (b) above, Sir.

Power connection to Ampati CHC

DR. MUKUL SANGMA   Shri M.N. MUKHIM (Minister, Power)

*41. Will the Minister-in-charge, Power be pleased to state:-

   

(a) Whether it is a fact that the Health and Family Welfare department had deposited money for connection of electricity  to Ampati Community Health Centre?

  (a) Yes, Sir.
 
 
 

(b) If the answer to (a) above is in the affirmative, whether the Community Health Centre has been electrified?

  (b) Yes, Sir.
 
 
(c) If not, the reasons thereof?   (c) Does not arise in view of reply, to (b) above.

Adhoc M.E. & H. Schools

Shri K.C. BORO   Dr. DONKUPAR ROY (Minister, Education)

*42. Will the Minister-in-charge, Education be pleased to state:-

   

(a) The total number of Adhoc M.E. Schools and High Schools District-wise?

 

(a) The total number of adhoc M.E. and adhoc High Schools District wise are as follows, Sir.

   

District

Total No. of adhoc M.E. School

Total No. of adhoc High Schools.

 
    _____________________________________________
    1. East Khasi Hills

167

68

    2. Ri-Bhoi

63

13

    3. West Khasi Hills

144

55

    4. Jaintia Hills

48

22

    5. East Garo Hills

64

26

    6. West Garo Hills

195

92

    7. South Garo Hills

44

18

(b) The number of Lower Primary Schools, Sub-Division and District-wise?

  (b) The number of Lower Primary Schools are as follows, Sir.

   Sub-division      Total Nos.        District            Total Nos.

    1. Shillong 669 E. Khasi Hills 772
    2. Sohra 103    
     
    1. Nongp0h 299 Ri-Bhoi 299
     
    1. Mairang 184 W. Khasi Hills 760
    2. Nongstoin 299    
    3. Mawkyrwat 277    
     
    1. Jowai 263 Jaintia Hills 537
    2. Khliehriat 191    
    3. Amlarem 83    
     
    1. Resubelpara 317 East Garo Hills 616
    2. Williamnagar 299    
     
    1. Tura 384 West Garo Hills 1090.
    2. Ampati 315    
    3. Dadengiri 391    
     
    1. Baghmara 353 South Garo Hills 353

Regional Institute of Planning & Programme

Shri SUJIT SANGMA   Shri M.N. MUKHIM (Minister, Power)

*41. Will the Minister-in-charge, Power be pleased to state:-

   

(a) Whether it is a fact that the Regional Institute of Planning and Programme has not yet been made functional?

  (a) Yes, Sir.
 
 

(b) If the reply to (a) above is in negative, when it will be made functional?

 

(b) & (c) The time frame within which the Institute is proposed to be commissioned is still uncertain owing to a policy matter pending with Government of India. This relates to the formal administrative approval of Government of India for a 90% financial assistance for the recurring costs of the Institute, on an actual basis, in addition to the approved 90% financial assistance for the capital costs. Hence State Government is also not forthcoming in release of their balance share of funds for the completion of the project.

(c) Whether it is a fact that inspite of repeated approach to the State Finance Department for sanctioning of the State matching fund, the matter was turned down and thereby the construction of the buildings of the Regional Institute could not be completed.

Khliehriat C & R.D Block

Shri O.N. SHYRMANG   Shri D.P. IANGJUH (Minister of State C & R.D.)

*44. Will the Minister-in-charge, Community & Rural Development be pleased to state:-

   

(a) The area of the Khliehriat Community & Rural Development Block in terms of square Kilometre?

 

(a) The area of Khliehriat Community & Rural Development Block is 2,107,26 sq.km, Sir.

(b) The present population of the Khliehriat Community & Rural Development Block.

 

(b) The present population of Khliehriat Community & Rural Development Block is 65,633, Sir.

(c) Considering the size, population and the backwardness of the area, whether Government is intending to create one more Community & Rural Development Block for Saipung Area with Headquarters at Saipung?

  (c) The matter is under consideration of the Government Sir.

Plying of MTC Bus.

Shri METHRONA R. MARAK   Shri H.B. DAN (Minister-in-charge, Transport)

*45. Will the Minister-in-charge, Transport be pleased to state:-

   

(a) Whether the M.T.C. is plying delux/luxury day - bus service from Shillong to Tura and vice-versa?

  (a) No, Sir.
 

(b) If the answer to (a) above is in the negative, the reasons thereof?

  (b) Generally, the travelling public prefer to travel by District type (Ordinary) bus as the fare is much less compared to Deluxe/Luxury bus fare.
 

Constitution of School Managing Committee

Shri TONSING N. MARAK   Shri BIRES NONGSIEJ (Minister-in-charge, Primary Education)
 

*46. Will the Minister-in-charge, Education be pleased to state:-

   

(a) Whether it is a fact that the Managing Committee of the village of Rongribo-Wa-Tregre Lower Primary School  has not been approved by the Deputy Inspector of Schools, East Garo Hills, Williamnagar as recommended by the Villagers after expiry of the term of the previous Managing Committee?

        (a) & (b)
     The information is being collected, Sir.

(b) If so, the reasons for not approving the M.C. as recommended by the Villagers and running of the School without Managing Committee for a long time?

 

Botanical Garden at Williamnagar

Shri DEBORA C. MARAK   Shri H.S. LYNGDOH (Minister in-charge, Forest and Environment)
 

*47. Will the Minister-in-charge,   Forest  and Environment be pleased to state:-

   

(a) Whether Government had sanctioned for improvement of Botanical Garden at Williamnagar?

  (a) Yes, Sir,
 
(b) Amount and date of sanction?   (b) Rs.12,600/- sanctioned on 30.8.97, Sir.

(c) If the answer at (a) is in negative the reasons thereof?

  (c) Does not arise in view of (b) above, Sir.
 

Power Supply

Shri KULERT CHERAN MOMIN   Shri M.N. MUKHIM (Minister, Power)
*48. Will the Minister-in-charge, Power be pleased to state:-    

(a) Whether it is a fact that there is frequent disruption of Power supply in the Garo Hills region during the last several years?

  (a) There have been occasional disruptions of Power to the Garo Hills Region in the recent past.
 

(b) If the reply is in affirmative, whether any alternative measures has been proposed/approved by the Government to meet the emergency/peoples suffering?

 

(b) Sir, the Government has proposed construction of 132 KV line from Agia (Assam) to Nangalbibra (Meghalaya) with funds proposed from NEC and another 132 KV single circuit line from Shillong to Nangalbibra under the State Plan during 9th Five Year Plan. In addition, at the instance of the State Government, the Sukla Commission has specifically recommended establishment of Garo Hills Thermal Power Station, (135 MW) at an estimated cost of Rs.540.00 crores. 

 
 
 
(c) If so, amount allotted in the Budget for 1998-99.  

(c) No amount has so far been specifically allotted for the purpose. However funds are expected from NEC in the current financial year.

 

Estimates for GSWSS

Shri ELSTON KHARKONGOR  

Shri P.M. SYIEM (Minister in-charge, Public Health Centre)

*49. Will the Minister-in-charge, Public Health Engineering be pleased to state:-

   

(a) What is the original estimate for construction of Greater Shillong Water Supply Schemes during the year 1996 till date?

 

(a) The original estimated cost of Greater Shillong Water Supply Scheme is Rs.2390 lacs sanctioned on 6-1-79.
     The revised estimated cost of the scheme is Rs.5822.52 lacs and sanctioned on 9-9-94, Sir.

 

(b) What is the future schemes and plans to cover the supply drinking Water to rural areas?

 

(b) As per Government of India's directive, all uncovered habitations are to be provided with safe drinking water by 2000 A.D. i.e. by 31-3-2000, Sir. 

 

MBOSE Issue

Shri K.C BORO   Dr. DONKUPAR ROY (Minister in-charge, Education )
*50. Will the Minister-in-charge, Education be pleased to state:-    

(a) Whether any decision has been taken by the Government on the Meghalaya Board of School Education issue?

 

(a) The Board has been newly constituted consequent upon the amendment of MBOSE Act, 1973 as per Meghalaya Ordinance No.3 of 1997 dt. 23.12.97 following Trifurcation of the Directorate.

   The reconstituted Meghalaya Board of School Education has 22 members including Secretary/Commissioner Education as the Chairman, the 3 Directors of Education, the Director of Industries, Director of Agriculture, Director of Health Services, representatives from NEHU, Secretary MBOSE and 13 other members to be nominated by the Government.

   With the newly constituted Board, all major issues pertaining to MBOSE will be dealt with to further improve and strengthen school Education in the State.

 
 
 
 
 
 
 
 
 
 
 
(b) If not, the reasons thereof?   (b) Does not arise in view of (a) above.

Rural Electrification Programme

Shri SUJIT SANGMA   Shri M.N. MUKHIM (Minister, Power)
*51. Will the Minister-in-charge, Power be pleased to state:-    

(a) Whether it is a fact that Government will revive the Rural Electrification Programme?

 

(a) Yes, Sir, provided sufficient funds are made available for the purpose.

(b) If so, how many villages will be electrified during the current financial year?

 

(b) Number of villages to be electrified will depend on the availability of fund.

Non - Recurring Grants

Shri KULERT CHERAN MOMIN   Dr. DONKUPAR ROY (Minister in-charge, Education )

*52. Will the Minister-in-charge, Education be pleased to state:-

   

(a) Whether it is a fact that the Deficit M.E. and the H.E Schools in the State have not been sanctioned with the non-recurring grants for the last three years?

  (a) No, Sir.
 
 

(b) If so, the reasons for not sanctioning the non-recurring grants?

  (b) Does not arise in view of (a) above.
 

(c) Total number of Deficit M.E. and the H.E. Schools in the State separately?

  (c) Total number of Deficit M.E. Schools - 132 Nos.
     Total number of Deficit High Schools - 121 Nos.

Purchase of New Buses

Shri ELSTON KHARKONGOR  

Shri H.B. DAN (Minister in-charge, Transport)

*53. Will the Minister-in-charge, Transport be pleased to state:-

   

(a) How many new buses the Government purchased during the year 1996 till date?

  (a) 9 (nine) buses only.
 
(b) What is the total expenditure for maintenance of the Transport fleet?   (b) 1996-97 Rs.74.95 lacs.
      1997-98 Rs.91.11 lacs.

Purchase of Vehicle Chasis

Shri ELSTON KHARKONGOR  

Shri K. SUSNGI (Minister in-charge, Tourism)

*54. Will the Minister-in-charge, Tourism be pleased to state:-

   

(a) Will the Government has purchased Two Vehicle Chassis recently?

 

(a) 2 (two) Tata Model LP 1510/42 Chassis were purchased on 28th January 1995.

(b) If so, what is the present fate of these vehicle?  

(b) The 2 Chassis were allotted to Local Firm at Shillong for construction body on 2.8.95 and 19.8.95. The construction of the body has not been completed till date.

New Satellite Township

Shri ELSTON KHARKONGOR  

Smti R. WARJRI (Minister in-charge, Urban Affairs)

*55. Will the Minister-in-charge, Urban Affairs be pleased to state:-

   

(a) What is the total areas of land acquired by the Government for New Satellite Township of Shillong at Mawdiang Diang?

 

(a) Sir, the total areas of land acquired so far is 101.79 hectares.

 
(b) The total cost of the land?  

(b) Sir, the total cost of the land is Rs.6,41,58,338.00 (Rupees Six crores forty one lakhs fifty eight thousand three hundred thirty eight) only.

 
 
(c) Amount paid so far?   (c) Sir, the entire amount has been paid.

(d) Whether it is a fact that the Government has acquired additional land for New Shillong Township at Mawdiang Diang?

  (d) No, Sir.
 
 

Construction of Hospitals

DR. MUKUL SANGMA   Dr. F.A. KHONGLAM (Minister in-charge, Health & Family Welfare)

*56. Will the Minister-in-charge, Health and Family Welfare be pleased to state:-

   

(a) Whether there is any proposal by the department for construction of a Maternity and Childrens Hospital at Tura?

  (a) Yes, Sir.
 
 

(b) If the answer to (a) above is in the affirmative, whether the Government intends to sanction the scheme?

  (b) Yes, Sir.
 
 

(c) If the answer to (a) above is in the negative, what are the steps being taken by the Government to set-up such hospital at Tura?

  (c) Does not arise in view of (a) & (b) above, Sir.
 
 

Permission to M.E. Schools and Lower Primary Schools

Shri K.C BORO   Dr. DONKUPAR ROY (Minister in-charge, Education )

*57. Will the Minister-in-charge, Education be pleased to state:-

   

(a) Whether it is a fact that more than a year the Committee has not met to finalise the opening permission to new M.E. Schools and Lower Primary Schools?

  (a) For L.P. Schools  - Yes, Sir.
(b) For M.E. Schools - Yes, Sir.
 
(b) If so, the reasons thereof?  

(b) Reconstitution of the Regional Committee by the Government.

 
(c) The names of the members of this Committee?  

(c) The members of the Regional Committee for East/West/Khasi Hills Ri-Bhoi and Jaintia Hills.

 
    1. Director, Elementary and Mass Education - Chairman.
   

2. Joint Director/Dy. Director of Elementary and Mass Education Member Secretary.

    3. Secretary, M.B.O.S.E. or his Nominee - Member.
   

4. Director, Higher & Technical Education or his nominee - Member.

   

5. All Inspector of Schools - or Asstt. Inspector of Schools under jurisdiction of the Committee - Member.

   

6. All Dy. Inspector of Schools, under the jurisdiction of the Committee-Member.

    (c) The members of the Regional Committee for East/West/South Garo Hills are :-
   

1. Director of Elementary & Mass Education.

 - Chairman
   

2. Jt. Director/Dy. Director, Elementary & Mass Education

 - Members Secretary
    3. Addl. Director, Tura  - Member
   

4. Secretary, MBOSE or his nominee.

 - Member
   

5. All Inspector of Schools or Asstt. Inspector of Schools. Under the jurisdiction of the Committee.

 - Member
   

6. All Dy. Inspector of Schools under the Jurisdiction of the Committee.

 - Members

Fund for Renovation, etc. of Umiam Power Project

Shri SUJIT SANGMA   Shri M.N. MUKHIM (Minister, Power)

*58. Will the Minister-in-charge, Power be pleased to state whether it is a fact that the Government of Japan has stopped the releasing of the O.E.C.F. funding of Rs.63 crores which had already been sanctioned for renovation, modernisation and up-gradation of the Umiam Stage I and Stage II Power Projects of MeSEB?

 

No, Sir, we have not received any formal communication from OECF regarding stopping of release of funds against Renovation and Modernisation of Umiam Stage I Power Station.

  OECF had not sanctioned any funds for Stage II renovation scheme.

     

Planting of Trees

Shri DEBORA C. MARAK   Shri H.S. LYNGDOH (Minister in-charge, Forest and Environment)
 

*59. Will the Minister-in-charge,   Forest  and Environment be pleased to state:-

   

(a) Whether it is a fact that the planting of trees along the roadside of all important roads in Meghalaya is being taken up?

 

(a) Sir, Roadside plantation is being taken up along some important roads.

 

(b) If so, the amount of money spent during the last 3 years Divisional wise?

  (b) Sir, the statement is laid on the table of the House.
 

(c) If the answer to (a)  above is in the negative, the reasons thereof?

  (c) Does not arise in view of (a) and (b) above.
 

Schools Under Deficit System

Shri KULERT CHERAN MOMIN   Dr. DONKUPAR ROY (Minister in-charge, Education )

*60. Will the Minister-in-charge, Education be pleased to state:-

   

(a) Whether the Government proposes to bring more M.E. and H.E. Schools under the deficit system grant-in-aid?

  (a) No, Sir.
 
 

(b) If the reply to (a) above is in the affirmative, total number of M.E and the H.E. Schools proposed to be brought under the system?

  (b) Does not arise in view of (a) above.
 
 

Wild Life Park

Shri ELSTON KHARKONGOR  

Shri H.S. LYNGDOH (Minister in-charge, Forest and Environment)

*61. Will the Minister-in-charge,   Forest  and Environment be pleased to state:-

   

(a) The total expenditure for maintenance of Wild life park in Garo Hills during the year 1996 till date?

 

(a) Sir, the expenditure for Wildlife Protection and maintenance of Wildlife Sanctuaries and National Parks in Garo Hills are as below:-

 
   

PLAN

NON-PLAN

    1995 - 96 Rs.71,00,038

88,46,120

    1996 - 97 Rs.36,13,821

80,48,123

    1997 - 98 Rs.47,31,126

83,28,470

    1998 - 99 Rs.  1,20,340

15,01,515

(b) Whether there is any illegal land transaction in wild life Park in Garo Hills?

 

(b) & (c)
    Allegation of discrepancy in area acquired have been received. The matter is subjudice in C.R. No. 4496/96 C.R.No.152/SH/97, C.R. No. 153/SH/97 and C.R. No. 154(SH)97 before the Hon'ble Guwahati High Court.

 
 
 

MEGHALAYA LEGISLATIVE ASSEMBLY

UN-STARRED

QUESTIONS AND ANSWERS

(Thursday, the 29th June, 1998)

Master Plan for Tura Urban Area

Shri KULERT CHERAN MOMIN   Smti R. WARJRI (Minister in-charge, Urban Affairs Deptt.)

36. Will the Minister in-charge, Urban Affairs Department be pleased to state :-

   

(a) Whether it is a fact that the Tura Urban area has been prepared a Master Plan?

  (a) Yes, Sir.
 

(b) If so, whether the Government has approved the Master Plan.

 

(b) Yes, Sir. The Government had approved the Master Plan Tura 1990-2011 vide Notification No.UAU.150/91/14, dt.31.7.91.

 

(c) If the answer is in affirmative, the reason of delay for implementation as per the Master Plan.

 

(c) Sir, many of the recommendations of the Master Plan, Tura (1990-2011) has been implemented by concerned Departments of the State Government and Development control measures are being enforced by Meghalaya Urban Development Authority.

 
 
 

Towns under PMIUPEP

Shri KULERT CHERAN MOMIN   Smti R. WARJRI (Minister in-charge, Urban Affairs Deptt.)
 

37. Will the Minister in-charge, Urban Affairs Department be pleased to state :-

   

(a) Whether it is a fact that Tura (Urban) Town has been included as one of the Towns under Prime Minister Urban Poverty Eradication  Programme PMIUPEP in the year 1995-96.

  (a) Yes, Sir.
 
 
 

(b) If the answer is in affirmative, whether the funds had been released up to date (i.e. for the year 1995-96, 1996-97 and 1997-98).

 

(b) Sir, the fund been released upto date is as follows:-
For 1995-96 Rs.28.19 lacs
For 1996-97 Rs.37.86 lacs
For 1997-98 Nil. 

 

(c) Whether it is a fact that physical development for whole town basis is taken up during the period (i.e. in the year 1995-96, 1996-97, 1997-98).

 

(c) Sir, Physical development to whole town basis have been taken up by Tura Municipal Board during 1997-98 only.

(d) If so, fund allotted and utilised by the TMB/State Government.   (d) Sir, the fund allotted by Government is Rs.11.79 lacs and the fund utilised by the Tura Municipal Board is Rs.0.29 lacs.

Office of the Conservator of Forest

Shri KULERT CHERAN MOMIN   Shri H.S. LYNGDOH (Minister in-charge, Forest & Environment )
 

38. Will the Minister in-charge, Forest and Environment be pleased to state :-

   

(a) Whether it is a fact that the office of the Conservator of Forest (CF), Wild life has been established/shifted 

 

(a) (b) & (c).
      The Headquarter of the Office of the Conservator of Forests (Wildlife) was shifted from Shillong to Tura during July 1996 in Public interest.

 

(b) If the answer is in affirmative, whether the Office is fully established with staff required?

         As at present nucleus staff of one UDA and 2 LDAs have been provided along with the other Grade IV staff Additional Staff will be provided during  1998-99.

(c) If so, the No. of subordinate Forest Officer and the Establishment staff therein.

Budget Allocation for S.W.P.

Shri KULERT CHERAN MOMIN   Smti R. WARJRI (Minister in-charge, Urban Affairs Deptt.)

39. Will the Minister in-charge, Urban Affairs Department be pleased to state :-

   

(a) The actual fund allotted out of the budget under S.N.P. during the last 3 years (1995-96, 1996-97 and 1997098).

 

(a)       Year

Budget Provision

Actual Fund allotted

1995-96

293.77 lakhs

292.29 lakhs

1996-97

295.74 lakhs

239.15 lakhs

   

1997-98

265.01 lakhs

242.63 lakhs

(b) The actual amount surrendered if any?   (b) Actual amount surrendered.
   

Year

Amount Surrendered  
   

1995-96

-   Rs.12.97 lakhs

 
   

1996-97

-   Rs. 72.22 lakhs

 
   

1997-98

-   Rs.29.04 lakhs

 
(c) The reasons for surrender?   (c) The amount had to be surrendered due to the disruption of supply of food stuffs for some time because all the Anganwadi Centres could not be made operational as targetted in a year.
 
 

Fishing Ponds

Shri KULERT CHERAN MOMIN   Shri NIMARSON MOMIN (Minister in-charge, Fisheries)
 

40. Will the Minister in-charge, Fisheries be pleased to state :-

   
(a) The total/actual No. of fishery ponds in the state.   (a) Sir, the total No. of Fishery Ponds in the State is 1414 Nos.
  (Out of which Departmental Farms - 14 Nos. and Private Fishery Ponds - 1400 Nos.)
 
 
 
(b) The total area in Hectres/Acres of Fishery Pond.  

(b) The total area in hectares of Fishery Ponds in the State is 292.488 hectares.
      (Out of which Departmental Farms - 40.71 hectares and Private Fishery Farms 251.77 hectares).

 
 
 

(c) Any Government revenue collected/deposited form the Government said firms.

  (c) Yes, Sir.
 

(d) Actual Government expenditure for subsidy/financial grants to fish farms during the last 5 years i.e. (1992-93 to 1997-98).

  (d) The actual Government expenditure for subsidy/financial grant of fish farmers are as follows :-

1992-93

-  Rs. 7,00,000
   

1993-94

-  Rs.13,79,995
   

1994-95

-  Rs.50,76,699
   

1995-96

-  Rs.64,84,021
   

1996-97

-  Rs.62,67,357
   

1997-98

-  Rs.56,70,792

Construction of Play grounds.

Shri ELSTON KHARKONGOR   Shri P.T. SAWKMIE (Minister in-charge, Sports and Youth Affairs)
 

41. Will the Minister in-charge, Sports and Youth  Affairs be pleased to state :-

   

(a) What is the total expenditure for construction of playground in the State, District-wise with locations during the year 1996 till date?

 

(a) The total expenditure for construction of play grounds in the State during the year 1996 till date is as shown below :-

A. NAME OF SCHEMES
EAST KHASI HILLS

LOCATION

 EXPENDITURE

1. Construction of play ground at Umlympung. Umlympung Rs.3,48,018.00
2. Improvement and extension of play ground at Jaiaw Student Field. Jaiaw Rs.7,48,065.00
   
3. Improvement of play ground and other works at Nongthymmai. Nongthymmai Rs.10,43,222.00
   
4. Construction of play field whc. at Balat. Balat Rs.3,32,196.00
5. Improvement of play ground and construction of sitting Gallery at Malki. Malki Rs.28,89,091.00
   
6. Construction of Outdoor Stadium at Smit. Smit Rs.12,31,331.00
7. Construction of play field etc. at Lawsohtun. Lawsohtun        Rs.2,89,119.00
8. Construction of Basketball Court at Lummawbah.. Lummawbah. Rs.4,55,891.00
9. Construction of Basketball Court at Little Flower School Malki. Malki Rs.1,01,559.00
   
10. Construction of Basketball Court and sitting Gallery etc., at Seng Khasi High School. Jaiaw Rs.2,15,981.00
_________________________
  TOTAL

= Rs.76,55,473.00

     
B. WEST KHASI HILLS LOCATION

EXPENDITURE

1. Construction of Outdoor Stadium at Nongpathar Pyndengrei, Nongstoin Nongstoin

Rs.5,80,207.00

2. Improvement of Play ground at Munailad. Munailad

Rs.4,70,830.00

  _________________________
  TOTAL

= Rs.10,51,837.00

 
C. JAINTIA HILLS LOCATION

EXPENDITURE

1. Construction of play field at Ummulong Ummulong

Rs.8,10,983.00

  _________________________
  TOTAL

= Rs.8,10,983.00

 
D. RI-BHOI DISTRICT LOCATION

EXPENDITURE

1. Construction of play field at Paham Syiem Nongpoh

Rs.20,35,369.00

2. Construction of Basketball Court at Bhoilymbong Bhoilymbong

Rs.1,44,297.00

  _________________________
  TOTAL

= Rs.21,79,666.00

 
E. EAST GARO HILLS LOCATION

EXPENDITURE

1. Improvement of play field and construction of V.I.P Rostrum at Resubelparaaham Syiem Resubelpara

Rs.2,83,089.00

2. Construction of Outdoor Stadium at Mendipathar Mendipathar

Rs.3,50,523.00

  _________________________
  TOTAL

= Rs.6,33,612.00

 
F. WEST GARO HILLS LOCATION

EXPENDITURE

1. Construction of play field at Ampati  Ampati

Rs.1,33,831.00

2. Improvement of play ground and Outdoor Stadium at Tura. Tura

Rs.9,93,469.00

3. Construction of play ground and other works at Rongsakona. Rongsakona

Rs.3,69,999.00

_________________________
  TOTAL

= Rs.14,97,293.00

 
G. SOUTH GARO HILLS LOCATION

EXPENDITURE

1. Construction of play ground at Gulpanibibra Gulpanibibra

Rs.1,78,052.00

  _________________________
  TOTAL

= Rs.1,78,052.00

  GRAND TOTAL

= Rs.1,40,06,116.00

(b) What is the total expenditure for construction of Jawaharlal Nehru Sports Complex Stadium at Polo grounds including maintenance of during the year 1996 till date?

(b) Rs.2,68,88,418/- Under Phase - II Sir.

(c) Whether the selection of contractor is as per norm of the Government

(c) Yes, Sir.

(d) If not the reason thereof?

(d) Does not arise in view of (c) above.

(e) What is the lastest position of the above stadium?

(e) About 75% of the work under phase-II have been completed.

Promotion of Tourism

Shri ELSTON KHARKONGOR  

Shri K. SUSNGI (Minister in-charge, Tourism)

*42. Will the Minister-in-charge, Tourism be pleased to state:-

   
(a) Whether there is any schemes or plans to promote Tourism in the State?   (a) Yes, Sir.
 

(b) At the present how many Tourist Sports in the State District wise?

  (b) Tourist Sport as identified by the Department are :-
 
    East Khasi Hills -  26
    West Khasi Hills -    3
    Ri-Bhoi -    5
    Jaintia Hills -    8
    East Garo Hills -    4
    West Garo Hills -    9
    South Garo Hills -    8
    _______________________________
   

TOTAL

   63

(c) What is the original estimates of Crowborough project?

  (c) Rs.445.00 lakhs

     Subjudice.

 
(d) Total expenditure till date?   (d) Rs.673.00 lakhs

(e) When the Government is expected to complete the project

(e) The Crowborough Hotel Project currently under litigation, arbitration as well as enquiry and therefore decision is yet to be taken for completion of the Project.

 Subjudice

(f) Whether it is a fact that the Government have constructed Yatri Nawas in Shillong and Tura?

(f) Yes, Sir.

(g) If so, what is the latest position of the construction?

(g) 1) Construction works of Tura Yatri Niwas has been completed Commissioning of the same is being taken up.

2) Completion of construction of Shillong Yatri  Niwas will take another six months time approximately. 

Loss of Revenue

Shri ELSTON KHARKONGOR   Shri H.S. LYNGDOH (Minister in-charge, Forest & Environment) 
 

43. Will the Minister in-charge, Forest be pleased to  state :-

   

(a) Whether there is any losses in revenue of Government on Supreme Court's order banning for supplying of Timber?

  (a) Yes, Sir.
 
 

(b) If so, what steps have been taken by the Government.

 

(b) "Since disposal of cut timber have been permitted by Honourable Supreme Court's orders dated 15.1.98 subject to the conditions laid down, this Government has taken steps in consonance thereto, to cause disposal of illegal timber in order to facilitate disposal/conversion of legal Inventorised timber".

 
 
 
 
(c) Any affected person on this regard?   (c) and (d). Information being collected, Sir.
(d) If so, the names of affected person and addresses?  

(e) What is the total expenditure of afforestation programme during the year 1996 till date?

  (e) State Plan
Year 1996-97 - Rs.137.19 lakhs
    Year 1997-98 - Rs.126.56 lakhs
    Year 1998-99 -     Rs.2.00 lakhs
     
    Centrally Sponsored Schemes
    Year 1996-97 - Rs. 77.49 lakhs
    Year 1997-98 - Rs. 22.33 lakhs
    Grand Total   - Rs.365.57 lakhs

Expenditure on Food Stuff and Medicine

Shri ELSTON KHARKONGOR   Shri M. MUKHIM (Minister in-charge, A.H. & Veterinary)
 

44. Will the Minister in-charge Animal Husbandry and Veterinary be pleased to state :-

     

(a) What is the expenditure during the year 1996-97, 1997-98 for supplying the foodstuff and medicine?

  (a) Sir, 1996-97 1997-98
   
    Food Stuff  
    Rs. 87.82 lakhs Rs.91.31 lakhs
    Medicine  
    31.14 lakhs Rs.28.45 lakhs
(b) The name of the suppliers District wise?  

(b) Sir, the Department does not have approved suppliers District wise. There are approved rates and approved suppliers for feed Ingredients/Medicines, viz.,

 
 

Name of Suppliers for feed ingredients :-

1996 - 97

 

1997 - 98

1. MECOFED, Shillong East Khasi Hills.   1. Krom Rapsang Shillong, East Khasi Hills.
2. Krom Rapsang,  Shillong East Khasi Hills   2. Abdul Kahit, Nongpoh, Ri-Bhoi District.
3. Emildabon Rapsang, Shillong East Khasi Hills.   3. Meghalaya Drugs Distributor, Tura West Garo Hills.
4. Meghalaya Drugs Distributors, Tura West Garo Hills   4. Godgrey N. Arengh, Tura West Garo Hills.
     
     A part from the above, there are two Registered Industrial Unit of Industries Deptt. Government of Meghalaya viz:-
     M/s Premier Feed Mill, Shillong East Khasi Hills & M/s Meghalaya Fodder Mills, Tura West Garo Hills who supply mixed feed in the State.

Name of Suppliers for Vety. Medicines

1996 - 97

 

1997 - 98

1. Krom Rapsang,  Shillong East Khasi Hills   1. Krom Rapsang Shillong, East Khasi Hills.
2. North Eastern Agencies Shillong East Khasi Hills   2.  North Eastern Agencies Shillong East Khasi Hills
3. Jyoti Trade Agency, Shillong, East Khasi Hills.   3. Jyoti Trade Agency, Shillong, East Khasi Hills.
4. Laboratory Aid, Shillong, East Khasi Hills.   4. Laboratory Aid, Shillong, East Khasi Hills.
5. Ricky Nongrum, Shillong East Khasi Hills.   5. Ricky Nongrum, Shillong East Khasi Hills.
6. Multi Science Guwahati, Assam.   6. Multi Science Guwahati, Assam.
7. Modern Drugs & Remedies, Tura West Garo Hills   7. Modern Drugs & Remedies, Tura West Garo Hills
 
8. Meghalaya Drugs Distributors West Garo Hills.   8. Meghalaya Drugs Distributors West Garo Hills.
    9. Rymbai Enterprise, Jowai.

Deficit and Adhoc College

Shri K.C BORO   Dr. DONKUPAR ROY (Minister in-charge, Education )

45. Will the Minister-in-charge, Education be pleased to state:-

   

(a) The total number of deficit colleges and the names thereof?

  (a) 15 Nos. Sir.
 

(b) The total number of Adhoc colleges and the names thereof?

 

(b) 7 Nos. Sir.
      Name of the Colleges are place on the Table of the House.

 

Number of Teachers

Shri K.C BORO   Dr. DONKUPAR ROY (Minister in-charge, Education )

46. Will the Minister-in-charge, Education be pleased to state:-

   
(a) The total number of teachers in :   (a) The total number of Teachers are as follows, Sir.
     (i) Deficit High Schools   (i) 2354
    (ii) Deficit M.E. Schools   (ii) 853
    (iii) Adhoc High Schools   (iii) 1719
    (iv) Adhoc Upper Primary Schools   (iv) 2687
    (v) Lower Primary Schools.   (v) 10281

(b) The total financial implication per month for payment of their salary?

  (b) Rs.7,30,24,285/-, Sir.
 

Construction of Bridges

Shri K.C BORO   Dr. DONKUPAR ROY (Minister in-charge, Education )

47. Will the Minister-in-charge, Public Works be pleased to state:-

   

(a) Whether it is a fact that the construction of Bridges over the following streams of Sarnanda-Jengjal Road has not been completed?

  (a) Yes, Sir.
 
 
(i) Rongak    
(ii) Rongrit    
(iii) Karsinang    
(iv) Breng    
(b) If the reply to the above is in affirmative :   (b) (i) Bridge over river :
(i) Amount sanctioned for each of them.   Rongak    - Rs.5,58,100/-
    Rongrit     - Rs.5,81,100/-
    Karsinang - Rs.4,05,100/-
    Breng       - Rs.5,58,100/-
(ii) Date of allotment of works   (ii) 19.12.96 ; 19.12.96 ; 24.4.96 & 19.12.96 respectively.
(iii) Stipulated time for completion of each work   (iii) 132 (twelve) months for each bridges.
(iv) Names of Contractors with their Addresses.  

(iv) For Bridge over river Rongak, work allotted to Shri Ding Sangma, Chiading P.O. Rongsak.
      For Bridge over river Rongrit, work allotted to Smt. Heroine R. Sangma, Kusimkolgiri, Williamnagar/
      For Bridge over river Karsinang, work allotted to Shri Raseng Marak Kusimkolgiri, Williamnagar.
      For Bridge over river Breng, work allotted to Shri Rojen Marak Rongak-gre, P.O. Samanda.

 
 
 
 
 
 
 
(v) Amount paid to each contractors.   (v) Paid to Shri Ding Sangma For Rs.2,52,767/-
         Paid to Shri Heroine R. Sangma for Rs.2,55,306/-
         Paid to Shri Rasong Marak for Rs.1,31,475/-
         Paid to Shri Rojen Marak for Rs.2,56,265/-
(c) Reasons for delay in execution of works.   (c) Shortage of the required sizes of steels materials.
(d) When the works will be completed?   (d) Within the current financial year 1998-99.

Blacktopping of Roads

Shri TONSING N. MARAK   Shri T.N. NONGLAIT (Minister in-charge, P.W.D.)

48. Will the Minister-in-charge, Public Works be pleased to state:-

   

(a) Whether it is a fact that the Black-topping works on some portions of Darugre Ronggrenggre via Songsak Road have not been completed?

  (a) Yes, Sir.
 
 
(b) If so, which portions have not been completed?   (b) (i) 334 M in 90th Km and
    (ii) 500 M in 91st Km.
(c) Name of the Contractors with their Addresses.   (c) (i) Shri Munarlkine P.Marak Mondal Barack Tura.
    (ii) Shri Peding Sangma, Songsak-Agalgre, respectively.
(d) Date of allotment of works.   (d) (i) 2.5.95. and (ii) 21.4.95 respectively.
(e) Amount sanctioned for each incomplete portion.   (e) Amount sanctioned for incomplete portion (as per sanctioned estimate)
90th Km (334.00M) = Rs.1.87,035.00
91st Km (500.00M) = Rs.2,93,024.00
 
 
 
(f) Stipulated time for completion of each incomplete portion.   (f) One year in case of each
(g) Amount paid to each of the contractors of each incomplete work.   (g) Rs.2,03,845/- to Shri Munarline P. Marak Rs.1,82,636/- to Shri Peding Sangma.
(h) Reasons for delay in execution of works   (h) Scarcity of Bitumen and inadequate fund position.
(i) When will the works of the incomplete portions be completed?   (i) During the current financial year 1998-99.
 

Construction of Bridges.

Shri TONSING N. MARAK   Shri T.N. NONGLAIT (Minister in-charge, P.W.D.)

49. Will the Minister-in-charge, Public Works be pleased to state:-

   
(a) Whether it is a fact that the construction of the Bridge over Chinabat Stream at Chinabat Bazar on Rongram-Rongrenggiri Road has been lying incomplete for a long time?   (a) Yes, Sir.
 
 
 
(b) If thre reply to the above is in affirmative ;   (b)
(i) Amount Sanctioned.   (i) Rs.13,81,000/-
(ii) Date of allotment of works   (ii) 17th September, 1994.
(iii) Stipulated time for completion of the work   (iii) One year.
(iv) Name of Contractor with his Address.   (iv) Smti. Sellika D. Marak, Tura (Mission Compound)
(v) Amount paid to the Contractor as running Bill.   (v) Rs.76,30,686/-

(c) Whether the remaining work can be completed with the balance amount?

  (c) Yes, Sir.
 
(d) If so, when?   (d) Expected to be completed with March, 1999.